PacifiCat Explorer

Área de elementos

Taxonomia

Código

Nota(s) de âmbito

    Nota(s) da fonte

      Mostrar nota(s)

        Termos hierárquicos

        PacifiCat Explorer

          Termos equivalentes

          PacifiCat Explorer

            Termos associados

            PacifiCat Explorer

              6 Descrição arquivística resultados para PacifiCat Explorer

              6 resultados diretamente relacionados Excluir termos específicos
              2022.028.0009 · Item · 24 May 1997
              Parte de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminum and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by David Greening.

              Sem título
              Ship Plans
              2022.028.0001-0014 · Série · 1897 - 1997
              Parte de John A. Clarkson Fonds

              Series consists of ship plans relating to John Clarkson’s position as the Nautical Inspector for Transport Canada. The breakdown of the 14 ship plans is: Island Princess (3), Jefferson (1), PacifiCat Explorer (5), Estevan (2), Stern Wheel Steamer (1), Indianapolis (1), Cheakamus (1).

              Sem título
              2022.028.0010 · Item · 24 May 1997
              Parte de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by David Greening.

              Sem título
              PacifiCat Explorer : Life Saving Plan (Sheet 2 of 2)
              2022.028.0011 · Item · November 1997
              Parte de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by D. Musick.

              Sem título
              PacifiCat Explorer : Fire Control Plan (Sheet 1 of 1)
              2022.028.0013 · Item · November 1997
              Parte de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by D. Musick.

              Sem título
              2022.028.0012 · Item · 24 May 1997
              Parte de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by David Greening.

              Sem título