Fast Ferry

Zone des éléments

Référentiel

Code

Note(s) sur la portée et contenu

    Note(s) sur la source

      Note(s) d'affichage

        Termes hiérarchiques

        Fast Ferry

          Termes équivalents

          Fast Ferry

            Termes associés

            Fast Ferry

              5 Description archivistique résultats pour Fast Ferry

              5 résultats directement liés Exclure les termes spécifiques
              2022.028.0009 · Pièce · 24 May 1997
              Fait partie de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminum and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by David Greening.

              Sans titre
              2022.028.0010 · Pièce · 24 May 1997
              Fait partie de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by David Greening.

              Sans titre
              2022.028.0011 · Pièce · November 1997
              Fait partie de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by D. Musick.

              Sans titre
              2022.028.0013 · Pièce · November 1997
              Fait partie de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by D. Musick.

              Sans titre
              2022.028.0012 · Pièce · 24 May 1997
              Fait partie de John A. Clarkson Fonds

              Operated between June 1999 and March 2000 three Catamaran Ferries International (CFI) fast ferries were intended to improve ferry service between the lower mainland and Vancouver Island as well as revive the shipbuilding industry in BC as Versatile Pacific Shipyards (VPS) had closed in the early 1990s. Designed by Incat Designs Pty Ltd in Australia and Robert Allan Ltd. They were built in Vancouver on Pier 94 just east of the former VPS. The project started in 1994 with an estimated total of 210 million which upon completion had ended up being 463 million, with each originally budgeted to be 70 million and ended up being 118 million while the other two were 104 million dollars. There were many delays in the construction including the welding of aluminium and there were also numerous operational problems which ensured that they only saw limited service. It became a major political issue for Glen Clark’s NDP government. Ship plan is drawn by David Greening.

              Sans titre